Case Study | Nurses Accommodation 

West Sussex Hospital

Contractor: Barnes Construction

Sub Contract Value: £1.5 Million

Sub Contract Period: 16 Weeks

  • HBACK TO CASE STUDIES

The Project

The framing system to 3 five storey buildings was completed within a 16-week period which included placing of the prefabricated shower pods within each of the 160 bedrooms.